GB battery pages

What Elexon's and NESO's published data show about individual grid batteries in Great Britain, month by month. Each page says which figures are metered, which are plans or NESO records, and which are estimates at a reference price. Each also says what public data cannot show.

  • Chapel Farm battery, near Luton, Bedfordshire

    Over the twelve months to October 2026 it held a frequency response contract in 69% of half-hours. The volume NESO accepted from it in the Balancing Mechanism came to 63% of its metered energy, against a fleet median of about 42%.

  • Coupar Angus battery, Perth and Kinross

    Over the twelve months to October 2026 it held no frequency response contracts, and NESO accepted little from it in the Balancing Mechanism. Its plans put through more energy than most: 3.5 full-power hours a day, against a fleet median of about 1.9.

  • Lakeside battery, Drax, North Yorkshire

    Over the twelve months to October 2026 the volume NESO accepted from it in the Balancing Mechanism came to 61% of its metered energy, against a fleet median of about 42%. It held a frequency response contract in 42% of half-hours.

  • Roosecote battery, Barrow-in-Furness, Cumbria

    Over the twelve months to October 2026 it held a frequency response contract in 97% of half-hours, and its plans discharged little energy: about a quarter of a full-power hour a day. It is one of the older batteries in the fleet, built in 2018 on the site of a former power station.

  • Whitebirk battery, Blackburn, Lancashire

    A new battery: Elexon's meter data for it starts with small volumes in February 2026, and NESO first accepted its bids and offers in March. From March to October the volume NESO accepted came to 73% of its metered energy, against a fleet median of about 44%.

We are adding batteries a few at a time. If you own or manage one and want its page, or see something wrong on one, email us.