A power purchase agreement, or PPA, is a long-term contract to buy the output of a power station at an agreed price. Most PPAs in Great Britain are signed with wind and solar farms. The buyer gets a known price and, usually, proof that its power is renewable. The generator gets a steady income, which lets it borrow the money to build.
This article is for anyone joining a trading desk, a supplier or a generator, or building their systems. It explains the types of PPA, how prices are set, and the risks each side takes. It shows how PPAs sit beside the Government's Contracts for Difference and renewable certificates, and settles one month of a wind farm's PPA.
Why PPAs exist
A wind or solar farm costs almost everything up front and almost nothing to run. Its owner borrows to build it, and lenders want to know the loan will be repaid. Selling the power at whatever the market pays, month after month, is too uncertain for most lenders. A PPA turns that uncertain income into a contract.
The buyer has reasons too. A business that uses a lot of power wants to fix its cost for years ahead. Think of a data centre, a supermarket chain or a railway. Many also want to show that their power comes from renewable sources.
Who signs a PPA
- A generator, usually a wind or solar farm, sells.
- A corporate buyer that uses the power itself buys. This is a corporate PPA.
- A supplier or trading house buys to resell. This is often called a utility or offtake PPA: the buyer provides the generator's route to market.
A business cannot simply take power from a wind farm across the grid. Supplying premises in Great Britain needs a supply licence. So most corporate PPAs are sleeved: a licensed supplier carries the power from the generator to the buyer, for a fee. It also handles the grid charges and the buyer's top-up supply. The Government's 2026 review of corporate PPAs found sleeved PPAs are "the dominant and most accessible structure in GB".
The types of PPA
- Sleeved corporate PPA. The buyer takes the generator's output through a supplier, as above.
- Virtual PPA. No power changes hands. The generator sells its power in the market as usual. The two sides then settle the difference between the PPA price and a market price. If the market pays less, the buyer pays the generator the gap; if it pays more, the generator pays it back. This is a financial swap, explained in energy derivatives explained.
- Utility or offtake PPA. A supplier or trader buys the output to resell, and takes on the trading and balancing the generator cannot do itself.
- On-site or private wire. The generator sits next to the buyer and supplies it directly.
How a PPA price is set
Most British PPAs share a few features. The Government's review found that:
- pay-as-produced is the most common structure: the buyer takes whatever the farm generates, hour by hour;
- prices are usually fixed and linked to inflation, or rise by a fixed step each year;
- terms of 10 to 15 years are typical. Deals announced in 2026 have often been shorter, at five to ten years.
Other structures move risk from one side to the other:
- Baseload or shaped. The generator promises a fixed amount every hour, whatever the weather. It must buy any shortfall in the market, so it asks for a higher price.
- Discount to market. The price follows the market, less a fixed discount. The buyer gets cheaper power, but no fixed price.
- Floors and collars. The generator is guaranteed a minimum price, sometimes with a maximum on top. The same idea is used for batteries, as battery storage in Great Britain explains.
The risks, and who carries them
Every PPA divides a handful of risks between buyer and seller:
- Price. The market may move far from the PPA price. A fixed price passes this risk to whoever would have done better at market.
- Volume. A still month produces less. Under pay-as-produced, the buyer takes whatever comes; under baseload, the generator must make up the gap.
- Shape, or capture price. Wind and solar produce most when everyone else's wind and solar does, which is when prices are lowest. So a farm earns less than the average price.
- Negative prices. When there is far more power than demand, prices can go below zero. Someone must decide who pays in those hours.
- Imbalance. If the farm produces more or less than was notified, the difference is settled at the imbalance price. How power trading works explains imbalance.
- Credit. The buyer must still be able to pay in ten years' time. Lenders look hard at this.
Our own calculation from 2025 data shows how much shape costs. The average day-ahead price in Great Britain was £80.66 per MWh. Wind farms earned 91.5% of that, and solar farms 82.6%, because they produced most when prices were low. The day-ahead price was below zero for 168 hours in 2025, against 155 in 2024.
PPAs and Contracts for Difference
The Government offers renewable generators its own long-term contract, the Contract for Difference (CfD). It is not the same thing as the financial CFDs offered to retail traders.
- How it works. The generator sells its power in the market. The Low Carbon Contracts Company, owned by the Government, then pays it the difference between an agreed strike price and a market reference price. If the market price is higher, the generator pays the difference back. Suppliers fund the scheme through a levy.
- The reference price. For wind and solar it is the day-ahead price for each hour.
- Negative prices. Contracts from the fourth round onward pay nothing in any hour when that price is below zero. Earlier contracts stop paying only after six negative hours in a row.
- The term. Since the seventh round, contracts for wind and solar last 20 years.
- The latest prices. The seventh round, decided in early 2026, cleared offshore wind at £91.20 per MWh. Onshore wind cleared at £72.24 and solar at £65.23, all in 2024 prices. The eighth round is under way. In November 2026 the Government set notional budgets of £1. The £1 is a placeholder, not a typo. The real budgets are set after the Government has seen the bids, and only "in consumers' interests".
A CfD and a corporate PPA rarely go together. The Government's review found holding both is "unlikely in practice". Corporate PPAs are often the fallback for projects that do not win a CfD. More than 30 GW of older wind and solar leaves the Renewables Obligation subsidy from 2027, and much of it will look for a PPA.
Renewable certificates (REGOs)
Ofgem issues a Renewable Energy Guarantee of Origin (REGO) for every MWh a renewable generator produces. Suppliers use REGOs to show how much renewable power is in the fuel mix they publish, and businesses use them to back green claims. A REGO can be sold with the power or separately. Some corporate PPAs bundle the REGOs with the power; others leave them out.
The EU stopped recognising UK REGOs in 2021. The Government has consulted on making certificates match power hour by hour, not just over a year, but nothing has been decided. Its next update is due in 2027.
How a desk values a PPA
There is no official formula, but the method is standard:
- Forecast the farm's output for every hour of the contract.
- Multiply by the forward price for each hour. That gives the market value of the output.
- Allow for shape, imbalance, negative hours and the value of the certificates.
- Compare with the PPA price, and discount for credit and time.
The difference is what the PPA is worth to each side. Mark-to-market P&L shows how a desk revalues positions like this every night.
The accounting changed in 2026. An amendment to the IFRS 9 accounting standard took effect on 1 January 2026. The UK Endorsement Board has endorsed it for UK use. It makes it easier for buyers to treat PPAs as normal purchases or as hedges.
The market today
Recent British corporate PPAs, from the companies' own announcements:
| Announced | Buyer | Seller | Term | Volume |
|---|---|---|---|---|
| January 2026 | Global Switch (data centres) | RWE, Brechfa Forest West onshore wind | 8 years | 70 GWh a year |
| February 2026 | Lidl GB | RWE, Gwynt y Môr offshore wind | 5 years | 100 GWh a year |
| April 2026 | Network Rail | RWE | 5 years from April 2027 | about 300 GWh a year |
| June 2026 | Global Switch | Drax, as sleeving supplier, "baseload solar" (Drax's words) | 10 years from January 2027 | 55 GWh a year |
The Drax deal is a good example of shaping: Drax sells solar output to a data centre as a steady supply, which Drax manages.
Worked example: one month of Carnmoor's PPA
Carnmoor is an invented wind farm, 75 MW of turbines with a 70 MW export limit, owned by the invented firm Northfield. Since July 2023 it has sold its output to Sablemere, an invented data centre, under a ten-year PPA:
- pay-as-produced, at £62.00 per MWh, rising each 1 July with inflation, capped at 3%: £66.70 from July 2026;
- curtailment: energy the grid stops Carnmoor exporting is paid as if generated;
- negative prices: in any run of six or more hours with a negative day-ahead price, the PPA price is zero for the whole run;
- sleeving: a licensed supplier carries the power to Sablemere for £1.20 per MWh, paid by Sablemere;
- certificates: every REGO goes to Sablemere.
The contract terms are the example's fixed facts. The month's output and market prices below are made up.
August 2026
| Item | Working | Amount |
|---|---|---|
| Carnmoor's metered output | 13,020 MWh | |
| Output in a negative-price run (Sunday 16 August, seven hours) | paid at zero | 210 MWh |
| Energy curtailed by the grid | paid as if generated | 350 MWh |
| Sablemere pays Carnmoor | (13,020 - 210 + 350) x £66.70 | £877,772 |
| Sablemere pays the sleeving supplier | 13,020 x £1.20 | £15,624 |
| Sablemere's total | £893,396 |
That is £68.62 for each of the 13,020 MWh that reached Sablemere, sleeving included, plus 13,020 REGOs. It is more than £66.70 for two reasons: the £1.20 sleeving fee, and the curtailed energy, paid for but never delivered. The seven zero-priced hours pull the other way.
At the made-up day-ahead prices for the hours Carnmoor produced, the same power was worth an average of £61.40 per MWh, or £799,428. So in August, Sablemere paid about £94,000 more than the market value of the power. That gap includes the sleeving fee. That is the price of a fixed cost and certified green power in a quiet summer month. In a cold winter, when market prices are high, the same PPA can cost less than the market.
What a PPA desk's systems have to track
- Hourly output against the contract: metered volumes, curtailed volumes, and which hours fall in a negative-price run.
- The price rules: the indexation date, the cap, the negative-price clause and each amendment, with the date it took effect.
- Settlement: invoices to and from the buyer, the sleeving fee, and imbalance charges.
- Certificates: REGOs issued, transferred and redeemed, matched to the power they back.
- Valuation: the PPA marked against forward prices every night, with the capture discount.
- Credit: what each counterparty owes, and the security it has posted.
What is an ETRM system? covers the system of record these calculations sit in.
Building or replacing this on your own desk? It is the work A115 does. See the systems work
What the full guide adds
This article is the short version. The full guide, Power Purchase Agreements, from the Practitioner Track, goes to the depth a desk works at:
- The four risks every PPA allocates, and a ledger showing who carries each one under each structure;
- Building a PPA price from the forward curve, step by step;
- CfDs and certificates in more depth;
- Valuation and bankability: what lenders need to see before they will lend against a PPA;
- Reading a real term sheet, clause by clause.
The full guide is in the community on Skool, with the rest of the series, and it is updated regularly as the markets change. If you want to work on a trading desk, read it to understand the subject properly. To join, start at the Energy Trading Fundamentals course page.
Sources
- Department for Business and Trade and DESNZ, Corporate Power Purchase Agreements: call for evidence (January 2026) and the government response (July 2026): types, structures, terms and the CfD overlap.
- Electricity Act 1989, section 4: supply needs a licence.
- Low Carbon Contracts Company, Contracts for Difference and market reference prices, and its hourly reference price data, from which we counted negative hours and calculated capture prices with Elexon and NESO output data.
- DESNZ, Contracts for Difference Allocation Round 7 and 7a results (January and February 2026), the AR7 reforms government response (July 2025), and the Allocation Round 8 Contract Budget Notice (November 2026), on gov.uk.
- Ofgem, REGO guidance (March 2026); DESNZ, Clean Flexibility Roadmap: July 2026 update.
- IASB, Contracts Referencing Nature-dependent Electricity (amendments to IFRS 9 and IFRS 7), effective 1 January 2026.
- RWE: Global Switch (22 January 2026), Lidl GB (5 February 2026) and Network Rail (15 April 2026).
- Drax, Drax supports Global Switch with CPPA sleeving agreement (June 2026).
- HM Treasury, FRAB 158: IFRS amendments review, listing the IFRS 9 amendment as endorsed by the UK Endorsement Board.